Goose Creek Watershed Restoration (13 Culverts)
#BPA-P-91901 #BPA-P-91901
Organization Upper Columbia Salmon Recovery Board Lead Entity
Sponsor Cascade Columbia Fisheries Enhancement Group (CCFEG)
Status Completed
Schedule Start Date: 9/15/2022 End Date: 10/13/2023
Category Category: Restoration
DESCRIPTION
BPA Contracts 90903 & 91901. This contract covers the remaining funding needed to implement the work described under contract # 90903, Goose Creek Watershed Restoration. After a competitive bidding process was completed, it was determined that an additional $40,000 was needed to complete the work. This cost will be split between the funders, the HCP Tributary Committees and BPA. A description of the work follows:

This contract will result in the correction of two fish passage barriers on Goose Creek, the addition of woody debris to 0.4 miles of Goose Creek for instream complexity, the improvement of 0.08 miles of road in the Goose Creek drainage to reduce fine sediment delivery to the creek, and riparian restoration of 0.1 acres adjacent to Goose Creek.
Show more  ↓
FUNDING SOURCES
FUNDING ENTRIES FROM GRANT PROJECT AGREEMENT
TypeDateFunding OrgFunding ProgramMatchAmount
Requested09/15/2022Bonneville Power Administration (BPA)Upper Columbia Programmatic$287,075.00
Requested11/22/2024Chelan County Public Utilities DistrictRocky Reach HCP Tributary Fund$275,000.00
Allocated03/01/2023Bonneville Power Administration (BPA)Upper Columbia Programmatic$287,075.00
Allocated11/22/2024Chelan County Public Utilities DistrictRocky Reach HCP Tributary Fund$275,000.00
Spent10/13/2023Bonneville Power Administration (BPA)Upper Columbia Programmatic-$287,075.00
Spent11/22/2024Chelan County Public Utilities DistrictRocky Reach HCP Tributary Fund-$275,000.00
Grant Project Agreement Totals Proposed Requested Allocated Spent Balance
$287,075.00 $562,075.00 $562,075.00 $562,075.00 $0.00
OTHER FUNDING (Funding that is NOT in a grant project agreement)
TypeDateFunding OrgFunding ProgramMatchAmount
Other Funding Totals Requested Allocated Spent Balance
Grand Totals Proposed Requested Allocated Spent Balance
PRIMARY SPONSOR
PROJECT CONTACT
PHOTOS

 
LOCATION
Chinook-Pop (ESU):Chinook-Upper Columbia River Spring, Wenatchee River, Endangered
Chinook2-Pop (ESU):Chinook-Upper Columbia River Summer/Fall, Not Warranted
County:Chelan
HUC12:Lower Chiwawa River (170200110308)
HUC8:Wenatchee (17020011)
Lead Entity Area:Upper Columbia River
Legislative District:12
Salmon Recovery Regions:Upper Columbia River
Sections:18
Steelhead-Pop (ESU):Steelhead-Upper Columbia River, Wenatchee River, Threatened
Township:T27NR18E
Upper Columbia Assesment Unit:Lower Chiwawa River
Watershed Administrative Unit:Lower Chiwawa
WRIA:Wenatchee
View project on a larger map

Related Projects

  APPLICATION FINAL 
RESTORATION METRICS
Miles of Stream and/or Shoreline Treated or Protected (C.0.b)
1.15mi1.15mi
Fish Passage Improvement    
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1)
0.73mi0.73mi
*Number of blockages / impediments / barriers impeding passage (C.2.b.4)
2.002.00
Miles Of Stream Made Accessible (FBRB)
0.00mi0.00mi
Miles Of Stream Made Accessible (FFFPP)
0.00mi0.00mi
 Culvert installed or improved (C.2.f.1)    
Miles of stream made accessible by culvert installation/repair (C.2.f.3)
0.73mi0.73mi
Number of culverts (C.2.f.2)
2.002.00
Instream Habitat Project    
Total Miles Of Instream Habitat Treated (C.4.b)
0.40mi0.40mi
 Channel structure placement (C.4.d.1)    
Miles of Stream Treated for channel structure placement (C.4.d.3)
0.40mi0.33mi
Number of structures placed in channel (C.4.d.7)
12.0011.00
Pools Created through channel structure placement (C.4.d.5)
6.006.00
Riparian Habitat Project    
*Total Riparian Acres Treated (C.5.b.2)
0.10acres0.10acres
*Total Riparian Miles Streambank Treated (C.5.b.1)
0.02mi0.02mi
 Planting (C.5.c.1)    
Acres Planted in riparian (C.5.c.3)
0.10acres0.10acres
Miles of streambank planted (C.5.c.4)
0.02mi0.02mi
Upland Habitat And Sediment Project    
Acres of Upland Habitat Area Treated (C.6.b.1)
30.00acres30.00acres
Miles of Road Treated (C.6.b.2)
0.08mi0.08mi
 Erosion control structures (C.6.e.1)    
Number of Erosion/Sediment Control Installations (C.6.e.3)
1.001.00
 Road drainage system improvements and reconstruction (C.6.c.1)    
Miles of Road Treated for drainage improvements and reconstruction (C.6.c.2)
0.08mi0.08mi
ADDITIONAL INFORMATION