| Organization | Upper Columbia Salmon Recovery Board Lead Entity |
| Sponsor | |
| Status | Active |
| Schedule | Start Date: 9/27/2021 End Date: 12/31/2028 |
| Category | Category: |
The Lower Chiwawa mainstem is one of only a few remaining strongholds for Wenatchee steelhead. The correction of the 13 fish passage barriers will improve connectivity to cold, clean and complex habitat, addressing all four VSP parameters required for recovery, and helping to improve the likelihood of the continued survival of this ESA species. The 13 fish passage barriers are on tributaries to the Lower Chiwawa River, and the correction of these barriers will improve connectivity to cold, clean, and complex habitat, while maintaining and improving ecosystem functionality vital to the persistence and recovery of ESA-listed species. The culvert barriers occur on Brush Creek (1), Gate Creek (2), Grouse Creek (2), Twin Creek (2), Goose Creek (2), Pole Creek (1), and Deep Creek (3).
| Type | Date | Funding Org | Funding Program | Match | Amount |
|---|
| Grant Project Agreement Totals | Proposed | Requested | Allocated | Spent | Balance |
| Type | Date | Funding Org | Funding Program | Match | Amount |
|---|
| Other Funding Totals | Requested | Allocated | Spent | Balance | |
| Grand Totals | Proposed | Requested | Allocated | Spent | Balance |
| APPLICATION | FINAL | ||||
Area Encompassed (acres) (B.0.b.1) | |||||
Miles of Stream and/or Shoreline Affected (B.0.b.2) | |||||
Miles of Stream and/or Shoreline Treated or Protected (C.0.b) | |||||
| Fish Passage Improvement | |||||
*Miles Of Stream Made Accessible (SRFB) (C.2.b.1) | |||||
*Number of blockages / impediments / barriers impeding passage (C.2.b.4) | 13.00 | ||||
Miles Of Stream Made Accessible (FBRB) | |||||
Miles Of Stream Made Accessible (FFFPP) | |||||
| Culvert installed or improved (C.2.f.1) | |||||
Miles of stream made accessible by culvert installation/repair (C.2.f.3) | |||||
Number of culverts (C.2.f.2) | 13.00 | ||||
| Instream Habitat Project | |||||
Total Miles Of Instream Habitat Treated (C.4.b) | |||||
| Channel structure placement (C.4.d.1) | |||||
Miles of Stream Treated for channel structure placement (C.4.d.3) | |||||
Number of structures placed in channel (C.4.d.7) | |||||
Pools Created through channel structure placement (C.4.d.5) | |||||
| Riparian Habitat Project | |||||
*Total Riparian Acres Treated (C.5.b.2) | |||||
*Total Riparian Miles Streambank Treated (C.5.b.1) | |||||
| Planting (C.5.c.1) | |||||
Acres Planted in riparian (C.5.c.3) | |||||
Miles of streambank planted (C.5.c.4) | |||||
| Upland Habitat And Sediment Project | |||||
Acres of Upland Habitat Area Treated (C.6.b.1) | |||||
Miles of Road Treated (C.6.b.2) | |||||
| Erosion control structures (C.6.e.1) | |||||
Number of Erosion/Sediment Control Installations (C.6.e.3) | |||||
| Road drainage system improvements and reconstruction (C.6.c.1) | |||||
Miles of Road Treated for drainage improvements and reconstruction (C.6.c.2) | |||||